Varese, Via Gasparotto: Completing the intervention for which we drew up the road and structural works project and carried out the Works Management.

The works envisaged by the P.I.I. (Integrated Intervention Plan) “AT21 Malerba“, within the framework of the intervention promoted by Esselunga SpA, aimed at recovering the area formerly occupied by the ceased production activities of the “Ex-Malerba” hosiery factory, has been completed. The roadway allows the connection of the A8 motorway with Via Gasparotto by crossing the body of the embankment of the Gallarate – Varese railway line and the highway itself with two push-over monoliths. The construction of the two structures, critical for their size and the context in which they were built, represents an essential milestone in completing the works we designed.