Go to Content

Infrastructures and Mobility Systems

Project Scopes:

Technical and Economic Feasibility, Definitive and Executive Design. Infrastructural, architectural, structural as well as landscape and environmental design of the intervention.

Project Scopes:

Scientific and operational technical coordination. Final and executive architectural, environmental and landscape design of the intervention including: Environmental Impact Study, Environmental Monitoring Project, Landscape Report and Witness Report.financed by

Project Scopes:

Integrated Programme of Intervention with Directional Character ‘PII1 – Milanofiori Sud

Project Scopes:

Technical and environmental documentation for the preparation of the intervention project.

Project Scopes:

New trade fair infrastructure to lengthen airport runway’

Project Scopes:

Executive Project of the carriageway limitation at the Taro I bridge at km 97+200, Taro VI bridge at km 106+400, Rio di Giuncareggio bridge at km 107+400, Case Fazzi bridge at km 108+000 and Cerosa bridge at km 110+500.

Project Scopes:

Preliminary Masterplan for the urban regeneration of the eastern part of the Stephenson Area, property of the Landev Fund and other adjacent areas

Project Scopes:

Feasibility project for the area of competence of some interventions included in an integrated framework of interventions for the implementation and renewal of the equipment for the service of the users and of the security towards

Project Scopes:

Final and executive architectural-functional project. Linate Airport station and “Kiss&ride” building, underground connections with the airport terminal and external arrangements

Project Scopes:

Line M4of the Milan Metro

Project Scopes:

Final and executive design of the infrastructural interventions of the road section between Bedonia and Loc. Montevacà

Project Scopes:

Section B, “1st Lot – 2nd Stralcio”. Technical and environmental tender documentation.

Project Scopes:

Requalification interventions and safety measures. Design feasibility document, final project final and executive design of the intervention.

Project Scopes:

Section within the municipal territory of Sorbolo Mezzani, between the towns of Chiozzola and Sorbolo Transport study aimed at defining design guideline strategies for resolving critical road conditions

Project Scopes:

Framework Agreement for the technical and economic feasibility design of economic feasibility of infrastructural interventions on the Sicilian road network by ANAS S.p.A.

Project Scopes:

Landscape reports of the motorway axis and all connecting and adduction roads.

Project Scopes:

Integrated and sustainable strategies for the best functional and settlement configuration within the regeneration processes of the Plan Document

Project Scopes:

Infrastructural, structural and plant engineering executive design

Project Scopes:

Feasibility study for the redevelopment of the buffer strip area as part of the redevelopment and development of the Port of La Spezia

Project Scopes:

Tender procedure Technical consultancy in the preparation of the technical documentation

Project Scopes:

Renovation of the bridge over the Po river

Project Scopes:

Executive project of the intervention, promoted by Anas SpA, called “Strada S.S. 219 “Gubbio-Pian d’Assino”.

Project Scopes:

Interventions improvements in the Ogliastrillo and Malpertugio macro-areas- Castelbuono.

Project Scopes:

Coordination, preliminary and final design of the civil and road works for the functional and architectural regeneration of the Waterfront of the City of La Spezia

Project Scopes:

Tender procedure for the design of the redevelopment works of the facade of Terminal 3.

Project Scopes:

Tender called “Extension du réseau tramway de Nice – Réalisation de la Ligne Est-Ouest”, concerning the construction of the underground section of the tramway line of the city of Nice (France).

Project Scopes:

Final design for the optimisation and architectural and road improvement of the infrastructure and of the environmental mitigation and landscaping interventions.

Project Scopes:

Preliminary, definitive and executive design of the infrastructural interventions.

Project Scopes:

Definitive road, architectural, structural and environmental design of the Campogalliano-Sassuolo motorway junction,

Project Scopes:

Construction site design, analysis of the impact on the urban landscape and related mitigation measures, the assessment of the impact of construction sites on critical factors and related mitigation interventions.

Project Scopes:

Executive functional architectural design of no. 7 stations: S Babila, Tricolore, Susa, Argonne, Forlanini F.S., Forlanini Quartiere and Linate. Executive structural design of 2 stations: FORLANINI FS and LINATE. Executive structural design of the surface works and design of signalling for the entire line.

Project Scopes:

Preliminary design, mobility study, preliminary environmental, final design

Project Scopes:

Preliminary Design and Environmental Pre-feasibility Study

Project Scopes:

Competition for the design, realisation and management of the mass transport infrastructure

Project Scopes:

Architecturally integrated acoustic design for Detailed Acoustic Study.

Project Scopes:

Renovation and refunctioning of the Ex cinema Roma building and of the adjacent public square area

Project Scopes:

Specialist consultancy within the framework of the executive project.

Project Scopes:

Planimetric adaptation of the roadway from km 30+420 to km 36+240 between Scodellino bridge and Bertorella junction.

Project Scopes:

Executive project for the track-doubling of the Circumvesuviana line Pomigliano d’Arco – San Vitaliano – IV Stralcio San Vitaliano.

Project Scopes:

Executive project and work accounting for the construction of the road linking the industrial areas of Nusco-Lioni, S. Angelo dei Lombardi (Porrara) and the town of S. Angelo dei Lombardi